• ADNOC Jubilee Festival – Scenic Fabrication & Interactive Event Installations, Abu Dhabi (2021)

    Large freestanding hashtag scenic signage installed for the ADNOC Jubilee Festival.

    Milestone celebrations require scenic environments that can communicate heritage, achievement and identity through both visual impact and visitor interaction. For the ADNOC Jubilee Festival at ADNOC HQ from 26–28 November 2021, Evolution Scenic delivered a series of custom scenic installations created to celebrate 50 years of ADNOC’s achievements and innovation.


    The project combined large-scale branded features, interactive elements, technical flooring and heavy-duty structural fabrication. Key installations included the ADNOC 50 Faces gallery stands, a main stage platform, giant hashtag signage, a pledge booth and custom branded backdrops. CNC and laser cutting were used throughout the fabrication process to achieve the precision required by the design.

    The Challenge


    The festival required multiple scenic elements to express the significance of ADNOC’s 50th anniversary while also functioning safely within a live public event environment.


    Several elements combined decorative treatment with technical or structural requirements. The 50 Faces gallery stands had to achieve a highly specific form, while the main stage needed to support repeated use and provide safe ramp access.


    The 336m² technical flooring system also required structural planning to ensure stability and even load distribution across the gallery environment.


    The project therefore demanded close coordination between design interpretation, detailed fabrication, structural support and installation, all within a tight production programme.

    The Solution


    Evolution Scenic translated the detailed design concepts into a coordinated package of scenic and structural installations.


    The ADNOC 50 Faces gallery stands were fabricated in the shape of the number “50,” using technical PVC flooring and reflective vinyl to reinforce the anniversary theme and create a strong visual focal point.


    A heavy-duty main stage platform was constructed with PVC flooring and custom ramp access, providing a functional central area for the festival programme.


    A large freestanding hashtag installation was also fabricated as both a visual landmark and an interactive photo feature.


    The pledge booth introduced a participatory element, giving attendees a dedicated space to engage with the celebration and contribute their own messages.


    Custom backdrops and branded scenic elements were produced across the wider event environment to maintain consistency in the overall visual identity.


    Advanced CNC and laser cutting were used throughout the fabrication process to achieve accurate profiles and repeatable components. The 336m² technical flooring system was supported by metal tube gallery frames, with calculations and planning carried out to ensure structural stability and even load distribution.

    Delivery Highlights


    • Scenic production for the ADNOC Jubilee Festival.

    • Event held at ADNOC HQ.

    • Event dates: 26–28 November 2021.

    • Celebration of ADNOC’s 50th anniversary.

    • ADNOC 50 Faces gallery stands.

    • Gallery structures formed in the shape of the number “50.”

    • Technical PVC flooring.

    • Reflective vinyl finishes.

    • Heavy-duty main stage platform.

    • Custom ramp access.

    • Giant freestanding hashtag signage.

    • Interactive pledge booth.

    • Custom event backdrops.

    • Branded scenic elements.

    • CNC fabrication.

    • Laser cutting.

    • 336m² technical flooring system.

    • Metal tube gallery frame supports.

    • Structural planning for stability and load distribution.

    • Fast-track fabrication and installation.

    Outcome


    The completed ADNOC Jubilee Festival environment combined large-scale visual features with interactive and functional scenic elements to create a cohesive 50th anniversary celebration.


    The 50 Faces gallery, main stage, hashtag installation and pledge booth each contributed a distinct role within the visitor experience, while the branded backdrops and reflective finishes maintained a consistent anniversary identity.


    The project demonstrates Evolution Scenic’s ability to deliver precision-led event fabrication where decorative form, structural performance, interactive features and technical flooring all need to be developed as part of one coordinated scenic package.

  • Why The Cheapest Fabrication Quote Often Becomes The Most Expensive

    Evolution Scenic team reviewing technical drawings beside a partially assembled scenic structure

    Technical planning, fabrication and finishing come together before a scenic structure reaches site.

    Why The Cheapest Fabrication Quote Often Becomes The Most Expensive


    Every fabrication company has encountered the same situation. A client requests several quotations for a scenic structure, exhibition environment or temporary installation. One proposal arrives at a noticeably lower price than the others, making it appear to be the obvious commercial choice.


    The difference may look like a saving during procurement. Once technical development, manufacturing and installation begin, however, unresolved items can quickly turn that saving into additional expenditure. The issue is rarely the quoted price alone. The real challenge is that fabrication quotations do not always compare like for like.

    Scenic installers making late adjustments to fabricated exhibition panels and structural connections

    Unresolved fabrication details can turn an apparent saving into additional site work and cost.

    The Same Design Can Represent Very Different Scopes


    A concept render communicates the intended appearance of a project, but it does not always explain how the structure will be engineered, manufactured, transported or installed. Two fabricators may therefore price the same visual concept using very different assumptions.


    One quotation might include:


    • Technical design development
    • Structural engineering reviews
    • Detailed fabrication drawings
    • Material samples and finish approvals
    • CNC programming and production
    • Trial assembly
    • Protective packaging
    • Transport planning
    • Site supervision
    • Installation labour
    • Access equipment
    • Final adjustments and snagging support


    Another quotation may cover only the physical manufacture of the visible elements. Neither approach is automatically incorrect. The difficulty begins when the exclusions, assumptions and responsibilities are not clearly understood. A lower headline figure may simply mean that important parts of the project remain unpriced.


    A meaningful quotation comparison should therefore examine scope before cost. The key question is not only, “How much is the structure?” It is also, “What work is required to deliver it successfully, and who is responsible for each stage?”


    Alternative timber and metal build methods for the same scenic wall design

    Different fabricators may interpret the same concept through very different construction methods.

    Engineering Work Is Easy to Overlook


    Engineering reviews, technical drawings and buildability studies are often less visible than finished scenic surfaces, yet they can influence almost every part of a fabrication project.


    Before manufacturing begins, the fabrication team may need to determine:


    • How loads move through the structure
    • Where steel or aluminium reinforcement is required
    • How separate components will connect
    • Whether the installation can be safely lifted
    • How the structure will be restrained on site
    • Whether floor, rigging or venue loading limits apply
    • How maintenance or technology access will be provided
    • How the structure will be divided for transport


    This work takes time, but it also resolves problems while they are still relatively inexpensive to correct. When engineering development is excluded or reduced, technical decisions may be postponed until the workshop or installation stage. By that point, materials may already have been purchased, components manufactured and transport booked. Alterations become slower, more disruptive and more expensive.


    The value of technical development is not always obvious in the final appearance. Its benefit is often measured by the problems that never occur.

    Engineer inspecting concealed steel reinforcement inside an Evolution Scenic scenic wall

    Much of the engineering value sits behind the finished scenic surface and remains unseen.

    Material Substitutions Can Change More Than Appearance


    Material selection is another area where quotations can differ significantly. Two structures may appear identical in a render but perform very differently depending on how they are built. A wall could be manufactured using timber framing, lightweight steel, aluminium extrusion, composite panels, MDF, plywood or a hybrid construction method. Each option affects weight, durability, finish quality, fire performance, handling and installation.


    Material substitution is not necessarily a negative practice. It can form part of responsible value engineering when the alternative has been properly assessed. The problem arises when a cheaper material changes the performance of the structure without that difference being clearly communicated.


    A lower-cost board, for example, may require additional support, more careful handling or greater finishing time. A heavier structural system may increase vehicle requirements, lifting arrangements and installation labour. A finish that performs well in a controlled exhibition hall may be unsuitable for an outdoor public installation exposed to heat, moisture, dust or repeated handling. The cost of a material should therefore be considered alongside its effect on the complete build methodology.

    Scenic fabrication material samples including timber, steel, aluminium and composite panels

    Material choice can create major differences between quotations even when the design looks unchanged.

    Installation Is Where Omissions Become Visible


    Many hidden costs only become apparent once a project reaches site. A structure may have been manufactured correctly in isolation but still be difficult to assemble within the available installation window. Connections may be inaccessible. Modules may be too large for venue entrances. Components may require more labour than anticipated. Fixing points may conflict with existing services or venue restrictions.


    When installation planning has been considered from the beginning, scenic components can be designed around practical site conditions. Modules can be sized for access routes, connections can be positioned where installers can reach them, and the build sequence can be coordinated with flooring, graphics, lighting and audiovisual systems.


    Without that preparation, the site team may need to improvise. Additional labour, overnight working, access equipment, cutting, welding, repainting and last-minute hardware can quickly increase the final cost. Delays may also affect other contractors whose work depends on the scenic installation being completed. Installation support is therefore not simply an optional service added after fabrication. It is part of the overall construction methodology.

    Evolution Scenic installers joining modular scenic walls with accessible concealed connections

    Installation-led design creates practical module sizes, reachable connections and coordinated interfaces.

    Transportation Is Part of the Design


    Transport costs are sometimes treated as a separate logistical item, but transportation requirements are often established by design and fabrication decisions. A structure that cannot be dismantled efficiently may require larger vehicles or multiple journeys. Fragile finishes may need specialist crates. Oversized components may require permits, escorts or alternative delivery routes. Poorly planned loading can increase handling time and the risk of damage.


    Experienced fabrication teams consider transportation while the structure is still being developed. Components may be divided into practical modules, nesting arrangements may be planned, lifting points incorporated and protective packaging designed around vulnerable surfaces. These decisions can reduce vehicle space, improve loading efficiency and minimise site handling.


    A cheaper manufacturing method can become expensive when it produces oversized, heavy or difficult-to-protect components. The relevant comparison is therefore not only the workshop price, but the total cost of delivering the fabricated work to its final position.

    Heavy scenic module requiring mechanical handling beside compact transportable alternatives

    The true cost of fabrication includes moving every component safely from workshop to final position.

    Rework Is Rarely Limited to One Cost


    Rework is one of the most common ways an apparently economical quotation becomes expensive.

    A single fabrication issue can create several connected costs:


    • Replacement materials
    • Additional workshop labour
    • Revised technical drawings
    • Repeat finishing
    • New transport arrangements
    • Additional installation labour
    • Extended equipment hire
    • Delays to dependent trades
    • Damage to completed scenic finishes


    There may also be a quality impact. Repairs carried out under severe time pressure do not always achieve the same finish as work completed in controlled workshop conditions. This is why experienced scenic teams place such importance on technical reviews, material testing, prototypes and trial assemblies.


    These activities add effort before installation, but they help identify dimensional conflicts, connection issues and finish problems early. The objective is not to make the quotation larger. It is to make the delivery process more predictable.

    Completed scenic preassembly aligned and labelled before packing for installation

    The purpose of early checking is to make the final delivery process predictable and controlled.

    Value Engineering Is Different From Cost Cutting


    A well-developed quotation should not prevent a project from being economical. In many cases, technical expertise creates opportunities to reduce cost without weakening the finished result. This is the purpose of value engineering.


    Effective value engineering may involve:


    • Simplifying concealed framing
    • Standardising repeated components
    • Reducing unnecessary material thickness
    • Selecting lighter structural systems
    • Using CNC machining to improve production efficiency
    • Dividing components to optimise transport
    • Designing reusable modular assemblies
    • Concentrating premium finishes where they have the greatest visual impact
    • Adjusting connection details to reduce installation time


    These decisions preserve the design intent while improving how the project is manufactured and installed. Cost cutting takes a different approach. It removes expenditure without always considering the wider consequences. The immediate quotation becomes lower, but the saving may transfer risk into durability, coordination, transportation or site installation.


    Good value engineering looks at the complete project. It considers the relationship between material cost, labour, logistics, programme, performance and finish quality.

    CNC cutting repeated scenic components from optimised material layouts

    Efficient CNC production, standardised parts and modular design can reduce waste and labour.

    How to Compare Fabrication Quotations Properly


    A useful quotation review should examine more than the final total.


    Before selecting a supplier, clients and project teams should confirm:


    • Scope: What is included, excluded and assumed?
    • Engineering: Are structural reviews and technical drawings included?
    • Materials: Are the proposed materials clearly specified?
    • Finishes: Are samples, testing and approval processes covered?
    • Transport: Is packaging, loading and delivery included?
    • Installation: Who provides labour, supervision, tools and access equipment?
    • Site conditions: Have access restrictions, working hours and venue rules been considered?
    • Coordination: Who manages interfaces with lighting, graphics, audiovisual systems and other contractors?
    • Revisions: How are design changes and additional work handled?
    • Handover: Are snagging, final adjustments and completion support included?


    This does not mean the most expensive quotation is automatically the best. A high price can also contain inefficiencies or unnecessary allowances. The aim is to compare the same responsibilities, performance standards and delivery requirements. Only then does the price comparison become meaningful.

  • How Scenic Concepts Become Buildable Reality

    Evolution Scenic team reviewing technical drawings beside a partially fabricated scenic structure.

    From technical development to fabrication, Evolution Scenic turns scenic concepts into engineered structures ready for manufacture, transport and installation.

    How Scenic Concepts Become Buildable Reality


    The earliest stages of a scenic project can appear deceptively simple. A concept visual may communicate a striking structure, sculptural environment or ambitious architectural feature through only a handful of carefully rendered images. The proportions look resolved, the surfaces are clean and the finished environment can appear almost ready to manufacture. In reality, approval of the concept is often the point at which the most technically demanding work begins.


    The visual now has to become a physical structure capable of being engineered, fabricated, finished, transported and installed within real project conditions. Every visible surface needs an appropriate substrate. Every large form requires an internal structure. Joints, connections, supports, lifting points and access requirements all need to be resolved, while the completed components must remain practical to manufacture using real workshop processes.


    At Evolution Scenic, technical development forms the bridge between creative intent and physical production. The objective is not simply to reproduce what appears in a render, but to understand how that appearance can be achieved through materials, engineering, fabrication and installation. A successful scenic structure is one in which the visible design and the construction behind it have been developed together from the beginning.

    Scenic structure showing framing, layered materials, connection details and modular fabricated components.

    Every visible surface depends on a practical system of materials, supports, joints and transportable components.

    From Creative Intent to Technical Information


    Many initial concepts are developed without detailed consideration for structural performance, material limitations, transport restrictions or installation methodology. This is entirely normal. Early visuals are intended to communicate scale, atmosphere, proportion and overall design intent rather than provide a complete manufacturing solution.


    The role of the scenic development team is not to reduce the ambition of the concept. It is to understand what the designer is trying to achieve and then identify the most practical way to deliver it.


    This requires careful interpretation. A curved feature wall shown as a continuous surface may need to be divided into CNC-machined ribs, plywood skins and transportable modules. A suspended sculptural feature may require an internal aluminium frame, engineered lifting points and carefully coordinated connection details. A large branded portal may appear monolithic in the visual but need to be broken into sections that can pass through venue access doors and be assembled efficiently on site. The appearance remains consistent, but the internal logic of the structure changes considerably.


    Evolution Scenic team comparing scenic concept visuals with technical drawings and material samples.

    The development process protects the original design intent while identifying practical routes to fabrication.

    Technical Review and Buildability Assessment


    Technical development usually begins with a detailed review of the available information. Concept visuals, drawings, venue plans, specifications and client requirements are assessed together to identify potential fabrication and installation challenges.


    The scenic team will typically review:


    ·       Overall dimensions and clearances

    ·       Structural loading requirements

    ·       Venue access and loading routes

    ·       Floor loading limitations

    ·       Suspension and rigging restrictions

    ·       Fire-performance requirements

    ·       Environmental conditions

    ·       Installation and dismantling periods

    ·       Transport dimensions

    ·       Interfaces with lighting, graphics and audiovisual systems


    A buildability assessment then considers whether the proposed form can be produced using available materials, machinery and workshop processes.


    This does not simply answer whether something can be built. Almost anything can be fabricated with enough time and budget. The more useful question is whether it can be built efficiently, safely and in a way that suits the project programme.


    For example, a complex freeform surface may be achievable through CNC machining, traditional scenic carpentry, fibreglass moulding or a combination of techniques. Each approach will produce different results in terms of cost, weight, strength, finish quality and production time.


    The correct solution depends on the priorities of the project.


    Fabricators checking a full-scale scenic junction mock-up during buildability assessment.

    Buildability assessment tests whether a proposed form can be produced accurately using real workshop processes.

    Developing the Construction Methodology


    Once the overall form has been understood, the scenic team begins defining how the structure will be assembled. This stage often involves breaking the concept into primary structure, secondary framing, surface materials, decorative finishes and removable components. The sequence of fabrication is also considered, particularly where different departments must work on the same element.


    A scenic structure may pass through several workshop processes. Steel frames may be fabricated first, followed by timber infill, CNC-machined cladding, scenic finishing, graphics and final assembly. Lighting channels, cable routes, access panels and service points may need to be incorporated before surfaces are closed.


    Poor sequencing can create unnecessary rework. A graphic panel may become difficult to install if the supporting frame is completed too early. A lighting component may become inaccessible once cladding is fixed. A decorative finish may be damaged if heavy mechanical work continues nearby. Technical planning helps prevent these issues by establishing a logical build methodology before fabrication starts.

    Fabrication team checking numbered scenic modules before final assembly and finishing.

    Technical planning prevents avoidable rework by resolving the build sequence before production begins.

    Material Selection


    Material selection is one of the most influential parts of scenic development. Timber, steel, aluminium, composites, fabrics, plastics, foams and specialist scenic coatings all offer different advantages. The correct choice depends on the required strength, finish, weight, lifespan, installation method and budget.


    Steel is often used where high structural strength or long unsupported spans are required. It can provide a reliable framework for large scenic structures, entrance features and elevated platforms. However, it also adds weight and may require lifting equipment or larger transport vehicles.


    Aluminium can offer a lighter alternative, particularly where repeated handling, modularity or suspended structures are involved. It is easier to transport but may require more specialised fabrication and connection detailing.


    Timber remains one of the most adaptable materials in scenic construction. It can be cut, shaped, laminated, CNC-machined and finished in many different ways. Scenic carpentry is particularly effective for walls, curved forms, platforms, decorative elements and lightweight modular structures.


    Composite panels and specialist sheet materials can help reduce weight while maintaining stiffness. Foams and lightweight modelling materials are often used for complex sculptural features, although they must be carefully detailed to achieve suitable durability and fire performance.


    Material decisions also influence the final scenic finish. A surface intended to resemble stone, concrete, metal or timber may use a completely different substrate beneath the visible coating. The finish provides the appearance, while the internal construction provides the required performance.


    Lightweight composite and foam scenic forms being shaped and prepared for finishing.

    Composite and modelling materials enable complex forms while demanding careful durability and fire-performance detailing.

    Engineering Reviews


    Engineering reviews frequently run alongside design development rather than taking place only after the design is complete. Structural calculations, load paths, connection details, support systems and fixing methods are examined as the concept evolves. This allows potential problems to be resolved before production drawings are issued.


    A large scenic wall, for example, must be checked for overturning, lateral stability and connection strength. A suspended feature must be reviewed for self-weight, dynamic loading and rigging capacity. A platform may require checks for live loads, deflection and edge protection.


    The visible structure is only one part of the problem. Engineers must also understand how forces move through the structure and into the supporting floor, roof system, ballast arrangement or temporary subframe. Temporary structures often require a different mindset from permanent construction. They must be strong enough to perform safely, but they must also be assembled quickly, dismantled efficiently and transported without unnecessary complexity.


    The strongest solution is not always the best solution. A scenic structure can become unnecessarily heavy, difficult to install and expensive to transport if engineering is approached without considering the temporary nature of the build. The most effective engineering solutions balance safety, fabrication efficiency, installation speed and visual intent.

    Engineered scenic steel connection with bracing, baseplates and bolted support details.

    Structural calculations and connection details allow potential issues to be resolved before fabrication drawings are released.

    Technical Drawings and Production Information


    Once the build methodology has been agreed, detailed production information can be prepared.

    Technical drawings translate the visual concept into dimensions, components and fabrication instructions. Depending on the project, this may include:


    ·       General arrangement drawings

    ·       Setting-out drawings

    ·       Steel fabrication details

    ·       Scenic carpentry drawings

    ·       CNC cutting files

    ·       Connection details

    ·       Assembly diagrams

    ·       Graphic artwork locations

    ·       Lighting and audiovisual coordination

    ·       Installation sequencing

    ·       Numbered component layouts


    These drawings must provide enough information for workshop teams to manufacture accurately while remaining clear enough for site teams to assemble the structure under time pressure.


    Production drawings are often supported by physical prototypes, sample panels or test assemblies. A curved junction may be mocked up to confirm the geometry. A scenic finish may be tested under show lighting. A connection may be trialled to check whether it can be installed using the available tools and access.


    These tests reduce uncertainty and allow problems to be solved before full-scale production begins.


    Full-scale scenic prototype testing geometry, finish quality and connection details.

    Prototypes and test assemblies allow geometry, finish and connection details to be confirmed before full production.

    Collaboration With Agencies and Designers


    Successful scenic development depends on clear collaboration between creative teams, technical designers, engineers, fabricators and installation crews.


    The scenic team must protect the original design intent while communicating the practical implications of different decisions. This is not achieved by simply rejecting difficult ideas. It requires proposing workable alternatives.


    If a structure is too large to transport in one piece, it may be divided into concealed modules. If a finish is too fragile for repeated handling, a more durable scenic coating may be developed. If a proposed material creates excessive weight, a lightweight substrate may be used without changing the final appearance.


    The most productive conversations focus on solutions.


    Early collaboration is particularly valuable. When fabricators and engineers become involved before the design is fully fixed, they can help shape the project around real manufacturing processes. This often improves quality while reducing unnecessary cost, weight and complexity.


    Late technical changes are usually more disruptive. Once graphics, lighting, finishes and production schedules have been confirmed, even a small structural adjustment can affect several other workstreams.


    Transportable scenic modules with concealed joints and lightweight durable construction.

    Practical development can improve transportability, durability and weight without changing the intended appearance.

    Designing for Transport and Installation


    A scenic structure is not complete when it leaves the workshop. It must still reach the venue and be installed safely.


    Transport requirements influence module sizes, packaging, lifting points and component protection. Large assemblies may need to fit within standard trucks or shipping containers. Delicate scenic finishes may require custom crates, padded supports or removable protective layers.


    Venue conditions also play a major role. Limited loading access, narrow corridors, low ceiling heights and restricted working hours can all affect the installation strategy.

    A structure that is easy to assemble in an open workshop may be much harder to install inside a finished venue. Technical development must therefore consider the actual site conditions from the beginning.


    Connections should be accessible. Modules should be clearly labelled. Lifting points should be positioned correctly. The installation sequence should avoid trapping components or blocking access for other trades.


    Where possible, complex structures are pre-assembled in the workshop before delivery. This allows the team to check alignment, finish quality and connection accuracy while there is still time to make adjustments.


    Evolution Scenic scenic modules labelled and protected for transport to site.

    A scenic structure is only truly resolved when it can leave the workshop and reach its installation position safely.

    Hundreds of Practical Decisions


    Successful scenic projects rarely depend on a single brilliant idea. More often, they depend on hundreds of practical decisions made throughout design development, engineering and fabrication.


    A joint is moved to improve transport efficiency. A steel frame is replaced with aluminium to reduce weight. A surface is divided into CNC-produced sections to improve accuracy. A removable panel is added for cable access. A hidden bracket is redesigned so it can be installed quickly on site.


    Individually, these decisions may appear minor. Together, they determine whether the final structure is safe, accurate, efficient and visually convincing.

    At Evolution Scenic, this process sits at the centre of scenic fabrication. Concepts are developed through technical drawings, engineering coordination, material testing, workshop knowledge and installation planning.


    The objective is not simply to reproduce an image. It is to understand the idea behind it, solve the practical challenges and develop a construction system that can deliver the intended result in the real world.


    That is how scenic concepts become buildable reality.


    Scenic fabrication details including joints, brackets, CNC edges and removable access panels.

    Successful scenic fabrication is built on many small technical decisions made throughout development and production.

  • Qudwa Teachers' Forum – Scenic Production & Multi-Room Conference Environments, Abu Dhabi (2017)

    Evolution Scenic main auditorium stage and black scenic backdrop at Emirates Palace.

    Large education forums require event environments that can support plenary sessions, smaller breakout discussions, informal networking and consistent branding across multiple spaces. For the Qudwa Global Teachers’ Forum at Emirates Palace in Abu Dhabi, Evolution delivered a comprehensive scenic package for an international gathering of more than 800 educators.


    Supported by the Education Affairs Office within the Crown Prince Court of Abu Dhabi, the forum welcomed senior dignitaries including His Highness Sheikh Abdullah bin Zayed Al Nahyan and His Excellency Sheikh Nahyan bin Mubarak Al Nahyan. Evolution’s scope included a fully customised main auditorium, nine breakout rooms, bespoke stages and backdrops, corridor infographic installations, furnished outdoor terraces and branded scenic and digital elements throughout the venue.

    The Challenge


    The forum required Emirates Palace to be transformed into a cohesive education event environment spanning multiple rooms and guest areas.


    The main conference needed a professional auditorium for keynote content, while nine breakout rooms had to support smaller sessions and discussions. Six of these rooms were created within the ballroom itself, requiring careful scenic division and individual staging within a shared venue.


    The event also needed to extend beyond formal presentation areas. Corridors had to communicate useful content, outdoor terraces needed to support lunch breaks and informal interaction, and the Qudwa brand had to remain consistent across all scenic and digital touchpoints.

    The Solution


    Evolution developed a multi-zone scenic solution tailored to the programme and layout of the forum.


    Six breakout rooms were constructed inside the ballroom, each with its own bespoke stage and backdrop. Three additional breakout rooms were created elsewhere within the venue, giving the event nine dedicated smaller-session environments in total.


    For the main conference programme, Evolution delivered a fully customised auditorium designed to provide a clear and professional setting for keynote presentations and large-format sessions.


    Corridors were transformed into informative spaces through custom infographic installations highlighting key insights and takeaways from the forum. This extended the event content beyond the conference rooms and created additional points of engagement for attendees moving through the venue.


    Outdoor terraces were furnished with custom-designed furniture, providing more relaxed spaces for lunch breaks and informal discussion.


    The Qudwa identity was applied consistently across scenic and digital elements, ensuring that the main auditorium, breakout rooms, circulation spaces and hospitality areas all felt part of one coordinated event environment.

    Six coordinated ballroom breakout stages with branded backdrops and screen surrounds.

    Delivery Highlights


    • Scenic production for the Qudwa Global Teachers’ Forum.

    • Event held at Emirates Palace, Abu Dhabi.

    • More than 800 educators in attendance.

    • Six breakout rooms constructed inside the ballroom.

    • Three additional breakout rooms elsewhere in the venue.

    • Nine breakout environments in total.

    • Bespoke stages for breakout sessions.

    • Custom scenic backdrops.

    • Fully customised main auditorium.

    • Main conference environment for keynote sessions.

    • Corridor infographic installations.

    • Informative attendee engagement features.

    • Custom-designed terrace furniture.

    • Outdoor lunch and networking areas.

    • Qudwa branding across scenic elements.

    • Brand integration across digital elements.

    • Multi-zone event transformation.

    • Delivery and installation.

    Evolution Scenic dimensional icon panels framing the conference stage environment.

    Outcome


    The completed environment transformed Emirates Palace into a coordinated forum setting capable of supporting large plenary sessions, smaller breakout discussions, content-led circulation spaces and informal networking.


    The nine breakout rooms provided dedicated environments for focused sessions, while the custom auditorium established a clear focal point for the main conference programme. Infographic-lined corridors extended the learning experience beyond formal rooms, and the furnished terraces created additional spaces for attendee interaction.


    The project demonstrates Evolution Scenic’s ability to deliver complex multi-room conference environments where staging, spatial division, branding, educational content and hospitality areas all need to operate together within one venue.

    Project Ecosystem


    Evolution Scenic – Scenic design and fabrication, breakout room construction, bespoke stages, scenic backdrops, auditorium development, infographic installations, terrace furniture, branding integration, delivery and installation.

    Side display surrounds integrated with smaller screens supplied by Evolution Technical.
  • Abu Dhabi Tourism & Data Analytics Forum – Scenic Production & Branded Data Environments, Abu Dhabi (2019)

    Evolution Scenic main forum stage with custom backdrop walls and access steps.

    Data-focused forums require event environments that make complex information easier to understand while still supporting presentations, workshops, networking and audience movement. For the Abu Dhabi Tourism & Data Analytics Forum, hosted by the Department of Culture and Tourism, Evolution delivered a coordinated scenic and branding package designed around both formal programme content and interactive data presentation.


    The scope included a main forum stage, branded workshop and keynote areas, a Tourism Data Lab, bespoke infographic walls, presentation booths, networking zones and custom wayfinding. Together, these elements created a clear and visually consistent environment for industry professionals exploring data-driven trends and innovation within Abu Dhabi’s tourism sector.

    Custom registration counter with printed branding and painted scenic finishes.

    The Challenge


    The forum needed to support several different event functions while maintaining one cohesive visual identity.


    The main programme required a professional stage for keynote speeches and panel discussions, while separate workshop areas needed to facilitate more focused and interactive sessions.


    A further challenge was presenting tourism data in a way that felt accessible and visually engaging. The Tourism Data Lab, infographic walls and branded booths needed to communicate information clearly without making the environment feel overly technical or visually fragmented.


    Networking and wayfinding also had to be integrated into the scenic package so that attendees could move easily between the different forum areas.

    Freestanding infographic walls presenting tourism data within the Abu Dhabi forum environment.

    The Solution


    Evolution developed and installed a coordinated series of scenic and branded environments across the venue.


    The main forum space was built around a high-end stage setup with custom scenic elements aligned to the event branding, providing a focal point for keynote presentations and panel discussions.


    Branded workshop and keynote areas were also created with tailored backdrops, signage and digital integration to support interactive sessions.


    For the Tourism Data Lab, Evolution produced bespoke infographic walls and branded presentation booths to create a more immersive way of communicating key tourism data and insights.


    Dedicated networking zones were fabricated with custom scenic branding, providing clearly defined areas for stakeholder discussion and informal engagement.


    Custom signage and pathfinding elements were installed throughout the venue to support navigation and connect the different event spaces into one coherent guest journey.

    Evolution Scenic lectern positioned within the custom-built main forum stage.

    Delivery Highlights


    • Scenic production for the Abu Dhabi Tourism & Data Analytics Forum.

    • Event hosted by the Department of Culture and Tourism.

    • Custom main forum stage.

    • Bespoke scenic stage elements.

    • Branded workshop areas.

    • Keynote presentation environments.

    • Digital integration within workshop spaces.

    • Tourism Data Lab installation.

    • Bespoke infographic walls.

    • Branded data presentation booths.

    • Custom networking zones.

    • Scenic branding across stakeholder areas.

    • Custom event signage.

    • Pathfinding and wayfinding elements.

    • Multi-zone scenic integration.

    • Delivery and installation.

    Tourism Data Lab displays combining timber structures, graphics and monitor kiosks.

    Outcome


    The completed forum environment supported presentations, workshops, data interpretation and networking within one coordinated scenic framework.


    The main stage established a professional setting for keynote content and discussions, while the Tourism Data Lab and infographic walls gave data a more physical and accessible presence within the event.


    Networking zones and wayfinding helped structure the wider guest journey, allowing the different parts of the programme to function clearly without losing visual consistency.


    The project demonstrates Evolution Scenic’s ability to create conference and forum environments where scenic fabrication, branding, digital content and information-led installations need to work together as part of a single visitor experience.

    Floor-applied wayfinding graphics connecting the forum’s scenic presentation areas.

    Project Ecosystem


    Evolution Scenic – Scenic production, main stage fabrication, branded workshop environments, Tourism Data Lab installations, infographic walls, presentation booths, networking zones, signage, wayfinding, delivery and installation.

    Evolution Scenic networking counter and branded partition within the forum venue.
  • KSA Sign @ Osaka Expo 2025 – Sculptural Signage & Scenic Fabrication, Osaka (2025)

    Evolution Scenic illuminated scenic feature for the KSA Pavilion at Expo 2025 Osaka.

    Large-format sculptural signage can operate as both a branding element and an architectural focal point. For the KSA presence at Expo 2025 Osaka, Evolution created a custom sculptural sign designed to reflect Saudi Arabia’s identity while providing a strong visual centrepiece for the pavilion’s opening ceremony.


    The finished installation combined precise fabrication with bold three-dimensional form and metallic gold and bronze finishes, creating a distinctive branded feature suited to the scale and profile of the international event.

    The Challenge


    The sign needed to function as more than conventional event branding. It had to achieve enough physical presence to stand as a sculptural feature while remaining visually refined and appropriate to the Saudi Arabia pavilion environment.


    The fabrication therefore required careful control of proportion, surface finish and dimensional accuracy so that the completed installation would read clearly from multiple viewing positions and maintain a premium appearance at close range.

    The Solution


    Evolution developed the KSA sign as a bespoke three-dimensional scenic installation, combining engineered internal construction with carefully finished external forms.


    The individual letter elements were fabricated to create a substantial sculptural presence, with the final surfaces treated in gold and bronze finishes to reinforce the visual identity of the installation.


    Attention to alignment, consistency and finishing ensured that the separate components read as one cohesive feature once assembled within the pavilion environment.


    The result was a large-scale branded installation that combined signage, scenic fabrication and sculptural presentation within a single feature.

    Delivery Highlights


    • Bespoke KSA sculptural signage.

    • Installation for Expo 2025 Osaka.

    • Three-dimensional letter fabrication.

    • Large-format scenic construction.

    • Precision fabrication and assembly.

    • Gold scenic finishes.

    • Bronze scenic finishes.

    • Pavilion branding feature.

    • Opening ceremony installation.

    • Sculptural event centrepiece.

    Outcome


    The completed KSA sign created a strong visual focal point for the Saudi Arabia pavilion and its opening ceremony at Expo 2025 Osaka.


    Its dimensional form and metallic finishes gave the branding a more architectural and sculptural presence than conventional signage, helping it operate as part of the wider pavilion environment rather than simply as a graphic identifier.


    The project demonstrates Evolution Scenic’s ability to translate branding into large-scale physical installations where form, finish and fabrication quality are central to the final visual impact.

    Project Ecosystem


    Evolution Scenic – Sculptural signage fabrication, three-dimensional scenic construction, finishing, assembly, delivery and installation.