• Dubai Light Art Festival – Outdoor Art Fabrication and Lighting Structures, Expo City Dubai (2024)

    Seven interconnected Musk Spectre figures extending across the 180-square-
metre installation area

    Public artworks displayed outdoors must preserve the artist’s creative intent while meeting demanding structural, environmental and visitor-safety requirements.


    For the Dubai Light Art Festival, held at Expo City Dubai from 26 January to 4 February 2024, AGB Events commissioned Evolution Scenic to fabricate and install three large-scale illuminated artworks.


    The project included Minaret 2.0 by Abdullah Al-Mulla, Musk Spectre by Dr Najat Makki and Afterlife by Maitha Hamdan. Each installation required a distinct combination of metal fabrication, structural calculations, specialist materials, integrated RGBW or LED lighting and secure outdoor installation.

    The Challenge


    The artists’ concepts needed to be translated into engineered structures capable of operating safely in a public outdoor environment.


    Structural calculations had to consider wind loading, material durability, environmental exposure, base design and counterweight requirements. Each installation also needed to protect visitors while maintaining the visual proportions and material character of the original artwork.


    The scale and geometry of Minaret 2.0 created a particular transportation challenge. Measuring approximately 2.1 metres wide, 2.1 metres deep and 10 metres high, its finished acrylic elevations required careful handling during delivery.


    Musk Spectre extended across 180 square metres and combined seven connected figures with fabric, internal lighting and three tonnes of sand. Afterlife required a six-metre cylindrical structure with a continuous 360-degree light curtain.


    All three installations needed to be coordinated, transported and securely positioned within the festival programme.

    Building Seven Interconnected Musk Spectre Figures


    Musk Spectre Sculpture occupied a much wider footprint. Evolution Scenic fabricated seven custom mild-steel figure structures and installed them across an area of approximately 180 square metres. The individual forms were elongated and relatively narrow, creating a strong visual contrast between their height and their lightweight translucent surfaces. Metal base plates interconnected the figures and helped establish their relationship across the completed composition. Accurate setting-out was required so that the spacing and orientation of all seven structures remained consistent with the intended arrangement.


    Stretch tulle fabric was fitted over the steel frames. The textile transformed the fabricated skeletons into softly defined illuminated figures while allowing the internal RGBW lighting to remain visible. Fabric tension needed to be controlled to preserve each silhouette without producing heavy creases or uneven areas that could disrupt the lighting effect.


    The RGBW fixtures created colour and shadow within the textile surfaces. Their positions had to account for the geometry of each figure and the visual behaviour of the tulle. Three tonnes of sand were installed around the completed structures. The sand formed part of the visible scenic environment, connecting the seven figures to the ground plane and extending the artwork beyond the fabricated forms themselves. Its installation was sequenced after the main structures had been connected so that the bases, cabling and access points could be completed first.

    The Solution


    Minaret 2.0 by Abdullah Al-Mulla

    Evolution Scenic fabricated a custom metal structure weighing approximately 1,000 kilograms. Geometric acrylic frames with reflective vinyl were incorporated into its elevations, strengthening the form’s interaction with daylight and artificial illumination.


    A two-tonne metal base structure and counterweights provided the stability required for outdoor display. Detailed calculations addressed wind loading and the behaviour of the tall installation in changing environmental conditions.


    Internal RGBW lighting introduced gradual colour transitions representing the five daily prayer times, supporting the artist’s exploration of time and the spiritual rhythm of life in Dubai.


    The completed structure’s height and delicate acrylic geometry required a planned transportation method to protect its finished surfaces during delivery to Expo City.


    Musk Spectre by Dr Najat Makki

    Seven custom metal structures were fabricated and connected through metal base plates to form the installation’s individual figures.


    The structures were wrapped in stretch tulle, creating translucent sculptural surfaces through which internal RGBW lighting could produce shadows and changing visual effects.


    The installation occupied an area of approximately 180 square metres. Three tonnes of sand were placed around the figures, supporting the artwork’s representation of women emerging from the ground and the transition of Dubai’s natural environment from water to sand.


    Afterlife by Maitha Hamdan


    Evolution Scenic fabricated a cylindrical metal structure measuring 2.4 metres in diameter and six metres high.


    A custom LED light curtain was installed around the full circumference of the cylinder, creating a continuous 360-degree illuminated surface.


    The structure provided the physical framework for Maitha Hamdan’s textile-led exploration of social boundaries, religion and personal memory.


    Engineering and installation


    Across all three artworks, Evolution Scenic combined technical calculations with custom metal fabrication, scenic material integration and secure base structures.


    Installation methods were developed to comply with the required specifications and public-safety standards. A coordinated delivery schedule enabled the artworks, counterweights, lighting components and three tonnes of sand to be transported and installed within the festival timeframe.

    Delivery Highlights

    • Three large-scale outdoor art installations
    • Custom structural calculations
    • Wind-load and environmental considerations
    • Visitor-safety planning
    • Bespoke metal fabrication
    • Secure base structures and counterweights
    • Integration of RGBW and LED lighting
    • Minaret 2.0 by Abdullah Al-Mulla
    • 1,000-kilogram minaret structure
    • Two-tonne metal base and counterweights
    • Geometric acrylic frames
    • Reflective vinyl finishes
    • Structure approximately 10 metres high
    • Musk Spectre by Dr Najat Makki
    • Seven interconnected metal figures
    • Stretch-tulle fabric surfaces
    • Installation covering 180 square metres
    • Three tonnes of sand
    • Afterlife by Maitha Hamdan
    • 2.4-metre-diameter cylindrical structure
    • Six-metre installation height
    • 360-degree LED light curtain
    • Complex transport and logistical planning
    • Secure installation at Expo City Dubai


    Outcome


    The three completed installations translated distinct artistic concepts into structurally developed outdoor artworks for public display at Expo City Dubai.


    Minaret 2.0 combined geometric acrylic forms, reflective surfaces and changing RGBW lighting within a tall counterweighted structure. Musk Spectre used illuminated fabric figures and sand to create a sculptural landscape across 180 square metres. Afterlife transformed a cylindrical metal framework into a continuous surface of light.


    Through structural calculations, specialist metal fabrication and planned installation, Evolution Scenic delivered each artwork in a form suited to the environmental and safety requirements of the festival.


    The project demonstrated how close coordination between artists, scenic fabricators, engineers and lighting specialists can protect creative intent while resolving the practical demands of large-scale public art.

    Project Ecosystem


    Evolution Scenic – Structural development, design calculations, metal fabrication, acrylic and reflective finishes, fabric integration, base structures, counterweights, transportation and outdoor installation.

    Evolution Technical – RGBW lighting control, internal illumination and technical integration across the artworks.

  • ADNOC Jubilee Festival – Scenic Fabrication & Interactive Event Installations, Abu Dhabi (2021)

    Large freestanding hashtag scenic signage installed for the ADNOC Jubilee Festival.

    Milestone celebrations require scenic environments that can communicate heritage, achievement and identity through both visual impact and visitor interaction. For the ADNOC Jubilee Festival at ADNOC HQ from 26–28 November 2021, Evolution Scenic delivered a series of custom scenic installations created to celebrate 50 years of ADNOC’s achievements and innovation.


    The project combined large-scale branded features, interactive elements, technical flooring and heavy-duty structural fabrication. Key installations included the ADNOC 50 Faces gallery stands, a main stage platform, giant hashtag signage, a pledge booth and custom branded backdrops. CNC and laser cutting were used throughout the fabrication process to achieve the precision required by the design.

    The Challenge


    The festival required multiple scenic elements to express the significance of ADNOC’s 50th anniversary while also functioning safely within a live public event environment.


    Several elements combined decorative treatment with technical or structural requirements. The 50 Faces gallery stands had to achieve a highly specific form, while the main stage needed to support repeated use and provide safe ramp access.


    The 336m² technical flooring system also required structural planning to ensure stability and even load distribution across the gallery environment.


    The project therefore demanded close coordination between design interpretation, detailed fabrication, structural support and installation, all within a tight production programme.

    The Solution


    Evolution Scenic translated the detailed design concepts into a coordinated package of scenic and structural installations.


    The ADNOC 50 Faces gallery stands were fabricated in the shape of the number “50,” using technical PVC flooring and reflective vinyl to reinforce the anniversary theme and create a strong visual focal point.


    A heavy-duty main stage platform was constructed with PVC flooring and custom ramp access, providing a functional central area for the festival programme.


    A large freestanding hashtag installation was also fabricated as both a visual landmark and an interactive photo feature.


    The pledge booth introduced a participatory element, giving attendees a dedicated space to engage with the celebration and contribute their own messages.


    Custom backdrops and branded scenic elements were produced across the wider event environment to maintain consistency in the overall visual identity.


    Advanced CNC and laser cutting were used throughout the fabrication process to achieve accurate profiles and repeatable components. The 336m² technical flooring system was supported by metal tube gallery frames, with calculations and planning carried out to ensure structural stability and even load distribution.

    Delivery Highlights


    • Scenic production for the ADNOC Jubilee Festival.

    • Event held at ADNOC HQ.

    • Event dates: 26–28 November 2021.

    • Celebration of ADNOC’s 50th anniversary.

    • ADNOC 50 Faces gallery stands.

    • Gallery structures formed in the shape of the number “50.”

    • Technical PVC flooring.

    • Reflective vinyl finishes.

    • Heavy-duty main stage platform.

    • Custom ramp access.

    • Giant freestanding hashtag signage.

    • Interactive pledge booth.

    • Custom event backdrops.

    • Branded scenic elements.

    • CNC fabrication.

    • Laser cutting.

    • 336m² technical flooring system.

    • Metal tube gallery frame supports.

    • Structural planning for stability and load distribution.

    • Fast-track fabrication and installation.

    Outcome


    The completed ADNOC Jubilee Festival environment combined large-scale visual features with interactive and functional scenic elements to create a cohesive 50th anniversary celebration.


    The 50 Faces gallery, main stage, hashtag installation and pledge booth each contributed a distinct role within the visitor experience, while the branded backdrops and reflective finishes maintained a consistent anniversary identity.


    The project demonstrates Evolution Scenic’s ability to deliver precision-led event fabrication where decorative form, structural performance, interactive features and technical flooring all need to be developed as part of one coordinated scenic package.

  • COP28 UAE Pavilion – Cultural Scenic Fabrication & Immersive Installations, Dubai (2023)

    Evolution Scenic modular timber display frames at the COP28 UAE Pavilion

    Cultural pavilions require scenic environments that do more than provide a backdrop. They must support storytelling, live demonstrations and visitor interaction while creating an authentic sense of place.


    During COP28, held from 30 November to 12 December 2023, the UAE Pavilion at Expo City Dubai provided an interactive cultural environment where visitors could explore Emirati heritage alongside the wider themes of sustainability.


    Appointed by the National Projects Office, Evolution Scenic designed, fabricated and installed scenic elements throughout the pavilion, creating environments for traditional craftsmanship, cultural performances, marine heritage displays and guided storytelling.


    The result brought together contemporary fabrication and traditional cultural references within a cohesive visitor experience.

    The Challenge


    The UAE Pavilion needed to communicate the country's cultural heritage within the context of COP28, creating an experience that was authentic, engaging and aligned with the pavilion's sustainability objectives.


    Multiple cultural activities had to coexist within the environment, including traditional craft demonstrations, gahwa preparation, traditional medicine displays, Ayallah performances and marine heritage exhibits.


    The scenic approach therefore needed to support live activity and visitor movement while maintaining a consistent visual language throughout the pavilion. Elements also needed to transition effectively between daytime and evening operation across the COP28 programme.

    The Solution


    Evolution Scenic developed a series of custom scenic environments designed around the pavilion's cultural programme and visitor journey.


    Modular scenic structures were fabricated to integrate naturally with the existing pavilion environment while supporting the project's sustainability-led approach. Dedicated areas were created for live demonstrations of traditional Emirati crafts, including date palm weaving, gahwa preparation and traditional medicine.


    Custom-built environments supported live Ayallah performances and marine craft exhibitions, allowing cultural practices to become active parts of the visitor experience rather than static displays.


    Scenic backdrops and interpretive display elements were integrated throughout the guided experience, helping support the stories presented to visitors as they moved through the pavilion.

    Ambient lighting was also incorporated into the scenic environment, allowing the atmosphere to transition from daytime operation into evening programming while maintaining visual consistency across the installation.

    Delivery Highlights


    • Scenic design, fabrication and installation
    • Modular scenic display structures
    • Cultural exhibition environments
    • Date palm weaving demonstration area
    • Gahwa preparation environment
    • Traditional medicine displays
    • Live Ayallah performance area
    • Marine craft exhibition environments
    • Interactive cultural installations
    • Scenic backdrops for guided storytelling
    • Interpretive display elements
    • Integrated ambient lighting
    • Day-to-night scenic environment
    • COP28 pavilion installation
    • Sustainability-led scenic approach


    Outcome


    The completed UAE Pavilion environment provided visitors with an interactive way to experience Emirati heritage during COP28, bringing traditional practices, performance and cultural storytelling together within a contemporary pavilion setting.


    Rather than presenting heritage exclusively through static exhibition displays, the scenic environments supported live artisans, performers and demonstrations, creating opportunities for visitors to engage directly with different aspects of Emirati culture.


    The project demonstrates Evolution Scenic's ability to deliver culturally informed exhibition environments where bespoke fabrication, visitor experience and live programming work together to communicate heritage within a major international event.

    Project Ecosystem


    Evolution Scenic – Scenic design, bespoke fabrication, modular display structures, cultural exhibition environments, performance areas, interpretive scenic elements, integrated lighting and installation.

  • Why The Cheapest Fabrication Quote Often Becomes The Most Expensive

    Evolution Scenic team reviewing technical drawings beside a partially assembled scenic structure

    Technical planning, fabrication and finishing come together before a scenic structure reaches site.

    Why The Cheapest Fabrication Quote Often Becomes The Most Expensive


    Every fabrication company has encountered the same situation. A client requests several quotations for a scenic structure, exhibition environment or temporary installation. One proposal arrives at a noticeably lower price than the others, making it appear to be the obvious commercial choice.


    The difference may look like a saving during procurement. Once technical development, manufacturing and installation begin, however, unresolved items can quickly turn that saving into additional expenditure. The issue is rarely the quoted price alone. The real challenge is that fabrication quotations do not always compare like for like.

    Scenic installers making late adjustments to fabricated exhibition panels and structural connections

    Unresolved fabrication details can turn an apparent saving into additional site work and cost.

    The Same Design Can Represent Very Different Scopes


    A concept render communicates the intended appearance of a project, but it does not always explain how the structure will be engineered, manufactured, transported or installed. Two fabricators may therefore price the same visual concept using very different assumptions.


    One quotation might include:


    • Technical design development
    • Structural engineering reviews
    • Detailed fabrication drawings
    • Material samples and finish approvals
    • CNC programming and production
    • Trial assembly
    • Protective packaging
    • Transport planning
    • Site supervision
    • Installation labour
    • Access equipment
    • Final adjustments and snagging support


    Another quotation may cover only the physical manufacture of the visible elements. Neither approach is automatically incorrect. The difficulty begins when the exclusions, assumptions and responsibilities are not clearly understood. A lower headline figure may simply mean that important parts of the project remain unpriced.


    A meaningful quotation comparison should therefore examine scope before cost. The key question is not only, “How much is the structure?” It is also, “What work is required to deliver it successfully, and who is responsible for each stage?”


    A traditional dhow boat prop being fabricated in a scenic workshop.

    Different fabricators may interpret the same concept through very different construction methods.

    Engineering Work Is Easy to Overlook


    Engineering reviews, technical drawings and buildability studies are often less visible than finished scenic surfaces, yet they can influence almost every part of a fabrication project.


    Before manufacturing begins, the fabrication team may need to determine:


    • How loads move through the structure
    • Where steel or aluminium reinforcement is required
    • How separate components will connect
    • Whether the installation can be safely lifted
    • How the structure will be restrained on site
    • Whether floor, rigging or venue loading limits apply
    • How maintenance or technology access will be provided
    • How the structure will be divided for transport


    This work takes time, but it also resolves problems while they are still relatively inexpensive to correct. When engineering development is excluded or reduced, technical decisions may be postponed until the workshop or installation stage. By that point, materials may already have been purchased, components manufactured and transport booked. Alterations become slower, more disruptive and more expensive.


    The value of technical development is not always obvious in the final appearance. Its benefit is often measured by the problems that never occur.

    Engineer inspecting concealed steel reinforcement inside an Evolution Scenic scenic wall

    Much of the engineering value sits behind the finished scenic surface and remains unseen.

    Material Substitutions Can Change More Than Appearance


    Material selection is another area where quotations can differ significantly. Two structures may appear identical in a render but perform very differently depending on how they are built. A wall could be manufactured using timber framing, lightweight steel, aluminium extrusion, composite panels, MDF, plywood or a hybrid construction method. Each option affects weight, durability, finish quality, fire performance, handling and installation.


    Material substitution is not necessarily a negative practice. It can form part of responsible value engineering when the alternative has been properly assessed. The problem arises when a cheaper material changes the performance of the structure without that difference being clearly communicated.


    A lower-cost board, for example, may require additional support, more careful handling or greater finishing time. A heavier structural system may increase vehicle requirements, lifting arrangements and installation labour. A finish that performs well in a controlled exhibition hall may be unsuitable for an outdoor public installation exposed to heat, moisture, dust or repeated handling. The cost of a material should therefore be considered alongside its effect on the complete build methodology.

    Scenic fabrication material samples including timber, steel, aluminium and composite panels

    Material choice can create major differences between quotations even when the design looks unchanged.

    Installation Is Where Omissions Become Visible


    Many hidden costs only become apparent once a project reaches site. A structure may have been manufactured correctly in isolation but still be difficult to assemble within the available installation window. Connections may be inaccessible. Modules may be too large for venue entrances. Components may require more labour than anticipated. Fixing points may conflict with existing services or venue restrictions.


    When installation planning has been considered from the beginning, scenic components can be designed around practical site conditions. Modules can be sized for access routes, connections can be positioned where installers can reach them, and the build sequence can be coordinated with flooring, graphics, lighting and audiovisual systems.


    Without that preparation, the site team may need to improvise. Additional labour, overnight working, access equipment, cutting, welding, repainting and last-minute hardware can quickly increase the final cost. Delays may also affect other contractors whose work depends on the scenic installation being completed. Installation support is therefore not simply an optional service added after fabrication. It is part of the overall construction methodology.

    A worker in a white hard hat faces a large green panel marked with a tall arched outline.

    Installation-led design creates practical module sizes, reachable connections and coordinated interfaces.

    Transportation Is Part of the Design


    Transport costs are sometimes treated as a separate logistical item, but transportation requirements are often established by design and fabrication decisions. A structure that cannot be dismantled efficiently may require larger vehicles or multiple journeys. Fragile finishes may need specialist crates. Oversized components may require permits, escorts or alternative delivery routes. Poorly planned loading can increase handling time and the risk of damage.


    Experienced fabrication teams consider transportation while the structure is still being developed. Components may be divided into practical modules, nesting arrangements may be planned, lifting points incorporated and protective packaging designed around vulnerable surfaces. These decisions can reduce vehicle space, improve loading efficiency and minimise site handling.


    A cheaper manufacturing method can become expensive when it produces oversized, heavy or difficult-to-protect components. The relevant comparison is therefore not only the workshop price, but the total cost of delivering the fabricated work to its final position.

    Heavy scenic module requiring mechanical handling beside compact transportable alternatives

    The true cost of fabrication includes moving every component safely from workshop to final position.

    Rework Is Rarely Limited to One Cost


    Rework is one of the most common ways an apparently economical quotation becomes expensive.

    A single fabrication issue can create several connected costs:


    • Replacement materials
    • Additional workshop labour
    • Revised technical drawings
    • Repeat finishing
    • New transport arrangements
    • Additional installation labour
    • Extended equipment hire
    • Delays to dependent trades
    • Damage to completed scenic finishes


    There may also be a quality impact. Repairs carried out under severe time pressure do not always achieve the same finish as work completed in controlled workshop conditions. This is why experienced scenic teams place such importance on technical reviews, material testing, prototypes and trial assemblies.


    These activities add effort before installation, but they help identify dimensional conflicts, connection issues and finish problems early. The objective is not to make the quotation larger. It is to make the delivery process more predictable.

    Carpenters assembling a modular timber structure in a scenic workshop.

    The purpose of early checking is to make the final delivery process predictable and controlled.

    Value Engineering Is Different From Cost Cutting


    A well-developed quotation should not prevent a project from being economical. In many cases, technical expertise creates opportunities to reduce cost without weakening the finished result. This is the purpose of value engineering.


    Effective value engineering may involve:


    • Simplifying concealed framing
    • Standardising repeated components
    • Reducing unnecessary material thickness
    • Selecting lighter structural systems
    • Using CNC machining to improve production efficiency
    • Dividing components to optimise transport
    • Designing reusable modular assemblies
    • Concentrating premium finishes where they have the greatest visual impact
    • Adjusting connection details to reduce installation time


    These decisions preserve the design intent while improving how the project is manufactured and installed. Cost cutting takes a different approach. It removes expenditure without always considering the wider consequences. The immediate quotation becomes lower, but the saving may transfer risk into durability, coordination, transportation or site installation.


    Good value engineering looks at the complete project. It considers the relationship between material cost, labour, logistics, programme, performance and finish quality.

    CNC cutting repeated scenic components from optimised material layouts

    Efficient CNC production, standardised parts and modular design can reduce waste and labour.

    How to Compare Fabrication Quotations Properly


    A useful quotation review should examine more than the final total.


    Before selecting a supplier, clients and project teams should confirm:


    • Scope: What is included, excluded and assumed?
    • Engineering: Are structural reviews and technical drawings included?
    • Materials: Are the proposed materials clearly specified?
    • Finishes: Are samples, testing and approval processes covered?
    • Transport: Is packaging, loading and delivery included?
    • Installation: Who provides labour, supervision, tools and access equipment?
    • Site conditions: Have access restrictions, working hours and venue rules been considered?
    • Coordination: Who manages interfaces with lighting, graphics, audiovisual systems and other contractors?
    • Revisions: How are design changes and additional work handled?
    • Handover: Are snagging, final adjustments and completion support included?


    This does not mean the most expensive quotation is automatically the best. A high price can also contain inefficiencies or unnecessary allowances. The aim is to compare the same responsibilities, performance standards and delivery requirements. Only then does the price comparison become meaningful.

  • ADSW – Youth Circle – Scenic Production & Branded Event Environment, Abu Dhabi (2018)

    Evolution Scenic circular scenic design integrating stage, branding and surrounding event furniture.

    Youth-focused forums need environments that feel professional enough to support serious discussion while remaining open, engaging and accessible to participants. For the ADSW Youth Circle during Abu Dhabi Sustainability Week 2018, Evolution delivered a tailored event environment designed to support dialogue around sustainability and renewable energy.


    Hosted in collaboration with Abu Dhabi Sustainability Week and the Ministry of Youth Affairs at the ADSW VIP Majlis in ICC Hall, the initiative brought together students from across the Emirates. Evolution’s scope included a custom stage, branded scenic elements, tailored event furniture and scenic backdrops with integrated AV, creating a cohesive setting for keynote content, interactive discussions and video coverage.

    Evolution Scenic circular Youth Circle stage with orange branded floor graphic in Abu Dhabi.

    The Challenge


    The Youth Circle required an environment that could support both formal content and open discussion among young participants.


    The stage needed to accommodate keynote addresses and interactive sessions, while the wider venue had to remain visually aligned with the sustainability focus of ADSW.


    Furniture, branding and technical infrastructure also needed to contribute to a comfortable and professional participant experience without making the space feel overly formal.

    White perimeter stage construction surrounding the central orange branded floor treatment.

    The Solution


    Evolution developed a coordinated scenic package tailored to the needs of the youth-focused programme.


    A custom stage environment was designed and built to support keynote addresses and interactive discussion formats.


    Branded scenic elements were fabricated and installed throughout the venue to create a consistent visual identity aligned with the wider ADSW environment and sustainability theme.


    Modern seating and event furniture were supplied to support participant comfort and encourage engagement throughout the sessions.


    Scenic backdrops were also developed with integrated AV elements, supporting presentations and high-quality video coverage while keeping the technical infrastructure visually connected to the event environment.

    Upright round Youth Circles branding feature positioned beside the low central platform.

    Delivery Highlights


    • Scenic production for the ADSW Youth Circle.

    • Part of Abu Dhabi Sustainability Week 2018.

    • Hosted in collaboration with the Ministry of Youth Affairs.

    • Event held at the ADSW VIP Majlis in ICC Hall.

    • Participation by students from across the Emirates.

    • Custom stage environment.

    • Interactive discussion setting.

    • Branded scenic elements.

    • Sustainability-led event identity.

    • Tailored event furniture.

    • Modern seating arrangements.

    • Scenic backdrops.

    • Integrated AV elements.

    • Video coverage support.

    • Delivery and installation.

    Circular orange floor graphic integrated into the custom low-profile scenic platform.

    Outcome


    The completed ADSW Youth Circle environment provided a clear and engaging setting for young participants to discuss sustainability and renewable energy.


    The custom stage supported keynote and interactive content, while the branded scenic treatment gave the venue a consistent visual identity. Furniture and integrated AV helped create a comfortable and functional setting for both in-room participation and recorded content.


    The project demonstrates Evolution Scenic’s ability to deliver youth and education-focused event environments where staging, branding, participant comfort and technical integration all need to work together within one cohesive space.

    AV integration for the ADSW VIP Majlis

    Project Ecosystem


    Evolution Scenic – Scenic production, custom stage, branded scenic elements, event furniture, scenic backdrops, AV integration, delivery and installation.

    Wide-angle view of the circular stage, logo feature and secondary branding wall.
  • Emirati Children’s Day – Festival Scenic Design & Fabrication, Abu Dhabi (2018)

    Evolution Scenic custom backdrop for the Bullying Prevention Award presentation stage.

    Children’s events require environments that are visually engaging, easy to navigate and flexible enough to support different activities throughout the programme. Scenic design plays an important role in creating that sense of discovery while providing practical spaces for workshops, entertainment and formal ceremonies.


    For Emirati Children’s Day 2018 at Umm Al Emarat Park in Abu Dhabi, Evolution Scenic was entrusted with the design and production of the festival environment and awards ceremony for the Supreme Council for Motherhood and Childhood.


    The project combined workshop spaces, activity areas, family hospitality zones, bespoke signage, stage scenery and a large suspended feature prop, all delivered within a demanding production timeline.

    Emirati Children’s Day scenic activity bay fabricated from MDF and plywood panels.

    The Challenge


    The event brought together educational workshops, creative activities, family areas, media requirements and a formal awards ceremony within one programme.


    Each environment needed its own purpose and visual identity while remaining connected to the wider festival experience. The awards ceremony also required a more formal setting for the presentation of the Council’s Bullying Prevention Award, with seating for 200 attendees.


    With a tight production schedule, Evolution Scenic needed to coordinate the fabrication and installation of multiple bespoke elements across the venue while ensuring everything was completed in time for the event.

    Custom workshop wall panels with playful graphics inside the festival tent.

    The Solution


    Evolution Scenic designed and produced a series of environments tailored to the different activities taking place throughout Emirati Children’s Day.


    A dedicated festival area incorporated a tent for workshops alongside custom activity spaces and an outdoor environment with food and beverage services and family seating. Individual workshop areas featured bespoke backdrops and interactive elements, creating distinctive spaces for educational and artistic activities.


    A dedicated media area was supported by custom signage to improve visibility and accessibility, while bespoke wayfinding and event signage were installed across the wider venue.

    For the awards ceremony, Evolution Scenic transformed the conference centre with a custom stage backdrop, event branding and seating for 200 guests, providing a more formal environment for the recognition programme.


    One of the project's defining scenic features was a giant paper aeroplane prop, fabricated as a large-scale visual installation and suspended from the ceiling. The piece created an immediate focal point while adding a playful element appropriate to the children's event.

    Evolution Scenic modular scenic panels defining the children’s creative workshop environment.

    Delivery Highlights


    • Festival scenic design and production
    • Dedicated workshop tent
    • Bespoke children's activity areas
    • Outdoor family seating environment
    • F&B area integration
    • Custom workshop backdrops
    • Interactive scenic features
    • Dedicated media area
    • Bespoke event and directional signage
    • Awards ceremony scenic production
    • Custom stage backdrop
    • Seating environment for 200 attendees
    • Giant suspended paper aeroplane prop
    • Multi-area venue installation
    • Delivery within a tight production programme


    Evolution Scenic fabricated walls, backdrops and signage unifying indoor and outdoor spaces.

    Outcome


    Emirati Children’s Day brought together educational, artistic and celebratory experiences within a vibrant environment designed specifically for children and their families.


    By creating dedicated spaces for workshops, activities, hospitality, media and the awards ceremony, Evolution Scenic supported the different functions of the programme while maintaining a cohesive event environment.


    The giant suspended paper aeroplane, bespoke activity areas and custom scenic elements gave the event a distinctive visual character, demonstrating Evolution Scenic’s ability to deliver multi-zone festival environments that combine creative fabrication with practical event functionality under demanding production timelines.

    Freestanding Dream Big scenic structure with oversized paper-aeroplane photo opening.

    Project Ecosystem


    Evolution Scenic – Festival scenic design, bespoke fabrication, workshop environments, custom backdrops, stage scenery, large-scale prop fabrication, signage, event branding and installation.